0 Members and 2 Guests are viewing this topic.
Just make an ever deepening cut into the one inch foam down to 1/2" at the ferry, then taper the sides of the cut.
Tapering the sides of the cut won't work--the whole freight terminal needs to be level with the ferry slip track. If you can find 1/2-inch foam, that would be great. In fact, instead of using 1/2-inch foam for the freight terminal area, I'd put the 1/2-inch foam on top of the 1-inch foam across the rest of the layout. Cut away all of the 1/2-inch foam for the freight terminal, except for the curve, which would be tapered.
That makes sense. I might go with two layers of 1/2-inch foam depending on the thickness of the car float.
Needless to say, no work involving the layout is being done, plus I am now debating whether or not a switching layout is the best idea for me since so many buildings means I'll need to make a major investment and also means I can afford no mistakes....I have been trying to talk myself into sticking to the original status quo so as not to seem as though I can never make up my mind and stick to it, but in fact it is more that I am trying to nail down my priorities.-Cody F.