One of the companies that the loading facilities for these is a client. MOdeling one would be a challenge, as they take up lots of space but would be dramatic. The one that I'm familiar with includes two huge loops for the trains. Very dramatic. The laoding racks are covered, so modeling could be easy, just two structures with tracks going in and out, and lots of storage tanks. It will mean a lot of money for the railroads, as it would take decades for pipelines to be built to the coasts, if possible. These trains will be on for decades.