Author Topic: The LIRR Industrial Service, Inc. shelf layout  (Read 80626 times)

0 Members and 1 Guest are viewing this topic.

Lemosteam

  • Crew
  • *
  • Posts: 5990
  • Gender: Male
  • PRR, The Standard Railroad of my World
  • Respect: +3831
    • Designer at Keystone Details
Re: The LIRR Industrial Service, Inc. shelf layout
« Reply #495 on: March 28, 2025, 10:47:31 PM »
+4
After some 5 week life challenges, I finally had the chance to do some work on the layout and details. First, I painted, weathered, and added cables to the open and closed grapple hooks. I need to make a ball of scrap to put inside the closed grapple.





I also lengthened the mooring tires and bollards to allow for another barge location closer to the newly added siding for more loading and unloading capability on the waterfront. I’m thinking of designing and printing a smaller vessel for the new mooring.





I also printed some more PRR style light post concrete piers for the WS streetlights that will be installed later on the extension across from the icing platform, between the branch line and the siding.