0 Members and 1 Guest are viewing this topic.
The Railwire is not your personal army.
Hey long time no see
Sunday I finally connected the tracks and switches to the bus wires (powered frogs) and yesterday got the left side of the canal started with track and switches. Next up is the other side of the canal. Bridges have sliding terminals so i can remove them to finish the canal. Going to muddy, brown it up some more, add debris and then liquitex the crap out of it. Elevated truss tracks will be installed soon!Gotta say my Bachmann 44 tonner runs perfectly over this trackage as does the K4. Even my BLI E8 runs perfectly.