The original was to include 'static' Nn3 sections of track to represent the QR trackage that the GDRMCo passed over, on the next iteration it will be a functional mainline (pretty much 2 layouts in 1, normal freight and a passenger train allowing some switching on the QR line, big a$$ ore trains and associated operations on the GDRMCo line).