Got a chance to poke around on the layout this week getting the Conrail and Guilford mains installed up to Simonds Junction and up to the Merrimack River crossing. I have 6 switches I still need to get in at the junction, but they are currently sitting in limbo at the Nashua USPS distribution center.
The Saturn 8K has been firing away on bridges and the abutments/bridges over Route 3 have been installed as well as the base for the roadway. I'm still trying to figure out what I want to do for structures here, so some stand-ins have been coming and going to at least figure out a height of what I want visually in this area. The elevated track is at 56" from the floor, so its a nice view for my 5'8" height. I do know that I want to have a mill on the right, and it will most likely be occupied by the 17970s-1990's New England iconic Building 19:
https://en.wikipedia.org/wiki/Building_19 [ Guests cannot view attachments ]
The C&D shipper comes off the mainline at Simonds Jct. runs over the street on a bridge and then downgrade into the facility. The building can support 8 cars on two tracks once it is finished.
[ Guests cannot view attachments ]
[ Guests cannot view attachments ]