Well, progress is being made, slowly. The track from the curved turnout to the turnout on the other side is only temporarily down, along with all the sidings. Once I can find the #7 turnouts I need, I'll be able to glue down the rest of the mainline.
I'm thinking of a small hill where I've got Square Mountain to breakup the flatness and hide at least part of the train. I'll want it smaller and I'm not sure if I want a tunnel or a cut. I'm also thinking that I'll want a lake in the corner next to the hill. I've never done water scenery before and I'd like to try it.
On top of Square Mountain, you can see a SD70ACe with a bad decoder, along with a baby monitor that lets me know when train (nap) time is over.