I'm looking for some of you guys thoughts on future scenery options. I have everything ready to install my industry tracks behind the interchange yard. Davids original plan for this area has much more depth then what I actually had. I'm torn between what I see as three options.1, put the industry track right next to the yard tracks. That gives me about 60 scale feet between the track and the backdrop. I'm not sure if that would give enough room to put a road and anything behind it.2, put the track in the center or the area. Most options as to track placement, but how do I tie the scenery in?? Street running?
Here is a slightly modified plan, a little closer to the prototype:I switched the Associate Transfer spur to the correct side of the tracks, along with the Plasti-pak/Prairie Concrete spur. I walked around the Associate Transfer building tonight while I was at work. I noticed that there is a large curving concrete loading dock on the west side of the building. It would make a nice feature and could easily model it but it had to switch sides to get it to fit right. I still didn't include a runaround, but with these changes I now have two spurs that pose a problem. I don't know where the prototype's runaround was at or if they ever had one, and I don't know where I would put one in at either. Still a work in progress and still not even sure if this is the plan that will be best. Any thoughts?Thanks, Mike
I'd put the run-around at the end of the line so the operations for the branch are pushed as far down the line as possible. I'd also add a third track for car storage.Jason