0 Members and 6 Guests are viewing this topic.
I think that may be a good idea. And with the size of the IT, it looks like it may require 2 jobs to work it. With the wye if the two jobs are on the IT at the same time it may reduce bottlenecks or even complete lockdown.
Already have one!
No doubt .. you are a bigger packrat than me
Ian,What about that idea of putting in a run around track on that narrow peninsula on the right. Not sure what you call it. Then change the direction that you tie in at Fiberoid? Jon
John, Milo isn't THAT hard. But the mill is busy. Ian when will you stop ripping things out?? You aren't going to get anywhere that way. Matt
Bout' time you stopped lurking and did some posting. ;DJon
Yeah I'm pretty embarrassed to say I totally missed this thread until you changed your signature. Maybe I should change my layout plans from Worcester-Boston to Worcester-Springfield, that way we can coordinate opps sessions. You started this damn thing a month ago and you are already years ahead of me. Damn flooding basement!I really admire you guys with track planning skills. I could never do that on a computer. I have no idea how I'm going to build my layout.
Epic