0 Members and 3 Guests are viewing this topic.
Still what-if-Conrail, or a new road?
Thats awesome Ian.... but you forgot the SB mail train, Mail 13.Brian
I'll reserve complete opinion until seeing a more detailed plan, but I'm already not liking that blob out into the middle of the room. Is that supposed to be some kind of industrial spur/IT track?Phil
Here is the basic trackplan. I'm no DKS! The layout models 6 miles of trackage, from CP 92 to CP 98, so it will be pretty much 1:1 in modeling. The major switching area includes the Fomer Athol Industrial Track (never renamed) and the Athol Industrial Track
Actually Dave, other than the area behind the stairs, the left side area of the stairs can have isles 36" wide min.