0 Members and 1 Guest are viewing this topic.
I hope the washer/dryer are all front loading, that way staging can be run across the top of them,
How long will it be before they show us how to add DCC to a tree?
The washing machines, a toilet, and a fridge for the beer. If that isn't a perfect staging/dispatcher's office, then I'm off my nut. Lee
i don't understand Ed's image - it's cut off on the bottom and i don't know how it relates to the space shown in Lee's sketch.
Ed, do you think you need that large a radius for the trains you'd be running with the motive power, etc.?Phil