0 Members and 2 Guests are viewing this topic.
Dave: I'm glad to see the layout progressing! Looks like the addition of the curved TO added about 6" of space there.
It actually inspired me, when the time comes to build another layout, not to limit myself by planning with what turnouts are commercially available.
How long will it be before they show us how to add DCC to a tree?
i have always thought it would be neat to build a layout by first laying the main and passing sidings, and then cutting in industrial sidings as i placed on-line customers.
I know this is an old thread but that switch looks like it turned out perfect. Are there any updates on it's performance? Did Dave every try any hand laid track?Jon.