Author Topic: layout construction timeline  (Read 4613 times)

0 Members and 2 Guests are viewing this topic.

John

  • Administrator
  • Crew
  • *****
  • Posts: 13389
  • Respect: +3255
Re: layout construction timeline
« Reply #15 on: September 12, 2007, 07:13:06 PM »
0
looks really good ..

Pomperaugrr

  • Crew
  • *
  • Posts: 1454
  • Respect: +1199
Re: layout construction timeline
« Reply #16 on: September 12, 2007, 11:42:14 PM »
0
That looks like fun to operate.  8)

Eric

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: layout construction timeline
« Reply #17 on: September 13, 2007, 08:42:05 AM »
0
That looks like fun to operate.  8)

Eric

first - yeah, it can be a challenge - it's easy when you cheat blocking the main, the diamond, use both staging tracks, and some 050 action...

second - what kind of screen name is that? 

-'67
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

Pomperaugrr

  • Crew
  • *
  • Posts: 1454
  • Respect: +1199
Re: layout construction timeline
« Reply #18 on: September 13, 2007, 08:52:39 AM »
0
Quote
what kind of screen name is that?

Ascii...and you shall receive.  Oh man, I crack myself up sometimes.   :D

The Pomperaug Railroad was the fictitious name  for the freelanced layout I was going to build.  Along the way, with the encouragement of a lot of folks , I changed my focus to prototype short line railroading.  The screen name POMPERAUGRR stuck with me.  Since I live next to the Pomperaug River, in CT, it still works.

Here's a bit of background on my current Housatonic Railroad layout project:

http://therailwire.net/smf/index.php?topic=13192.0

Eric
« Last Edit: September 13, 2007, 08:55:18 AM by Pomperaugrr »

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: layout construction timeline
« Reply #19 on: September 16, 2007, 09:52:04 AM »
0
here is the layout as built:



-steve
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2065
  • Respect: +195
Re: layout construction timeline
« Reply #20 on: September 16, 2007, 10:07:47 AM »
0
here is the layout as built:



-steve

that N&W needs to be changed back to the New York, Chicago & St. Louis

:)
"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: layout construction timeline
« Reply #21 on: September 16, 2007, 10:05:40 PM »
0


that N&W needs to be changed back to the New York, Chicago & St. Louis

:)

the N&W absorbed the NKP in 1964 - i'm modeling 1967 - sorry dude.  you are welcome to bring some NKP freight cars over ;)

-'67
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?