0 Members and 1 Guest are viewing this topic.
My goals:1) Design a bunch of stuff for a multitude of customers.2) Photograph, measure, and nit-pick said stuff, ensuring my customers have the best design I can give them. 3) Relocate existing water heater, add secondary lowboy water heater under stairs.4) Relocate plumbing so it doesn't sit over proposed layout, insulate hot water side.4a) Remove extraneous plumbing that previous owners had a field day with.5) Remove pressure tank, pump and piping for the old well system the house once had.6) Relocate/rebuild existing wall and door in basement, moving it over ~4 feet.6a) Build wall across to make a closest and provide uncluttered access to electrical panel.7) Remove all HVAC ducting. Relocate other existing wall by the stairwell forward ~2' into existing finished room.8a) Build wall/2doors to allow access to layout room/basement from stairwell without going through finished room.9) Build another wall/door to close of finished room, making it separate from layout/basement/washroom/stairwell.9b) Lock teenage son in finished room until he turns 18.10) Install auxilary heat pump over existing modern oil furnace, rebuild all HVAC ducting with products made this century.