Author Topic: A Newbie's First Layout, InterUrban Switching Services  (Read 7074 times)

0 Members and 1 Guest are viewing this topic.

wazzou

  • Crew
  • *
  • Posts: 6730
  • #GoCougs
  • Respect: +1656
Re: A Newbie's First Layout, InterUrban Switching Services
« Reply #15 on: November 30, 2013, 04:55:49 PM »
0
That's a really great observation and solution Gary.
Bryan

Member of NPRHA, Modeling Committee Member
http://www.nprha.org/
Member of MRHA


PRRATSF

  • Crew
  • *
  • Posts: 86
  • Respect: +2
Re: A Newbie's First Layout, InterUrban Switching Services
« Reply #16 on: December 01, 2013, 11:49:57 PM »
0
If at all possible, take the idea of wrapping the column in walls and making that industry #4 with a loading dock on the front thus opening up more space on the left for #5 and #6.

Sam

Catt

  • Crew
  • *
  • Posts: 1721
  • Gender: Male
  • Respect: +28
    • Boylerwerx
Re: A Newbie's First Layout, InterUrban Switching Services
« Reply #17 on: December 03, 2013, 08:26:18 AM »
0
I would definately make use of that column as part of a industry or a stand alone industry even if it did not get rail service.
Johnathan (Catt) Edwards
Sole owner of the
Grande Valley Railway
100% Michigan made

Tremelle

  • Posts: 6
  • Respect: 0
Re: A Newbie's First Layout, InterUrban Switching Services
« Reply #18 on: December 14, 2013, 02:21:31 AM »
0
I have made some changes to the layout to reduce the switch cost and tried to use the less is more approach. I also incorporated some suggestions I have received along the way. The column will not be wrapped as an industry. Here is the latest revision. I am also including the file to play with on TrainPlayer. What do you think?

http://www.sykesweb.com/images/trainlayout/InterUrbanLayoutKatoR2.xml


wcfn100

  • Crew
  • *
  • Posts: 8842
  • Respect: +1223
    • Chicago Great Western Modeler
Re: A Newbie's First Layout, InterUrban Switching Services
« Reply #19 on: December 14, 2013, 03:14:21 AM »
0
Unless there's a elevation change for Industries 5 and 6, or you just like switching puzzles, industry 6 could have it's own turnout.  I'd probably remove the right most turnout at industry 4 and make it a stub.  Then re-align the industry 5 track to remove the 'S' curve.


Jason


DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7026
Re: A Newbie's First Layout, InterUrban Switching Services
« Reply #20 on: December 14, 2013, 07:01:03 AM »
0
Some food for thought.



There's a greater variety of industry size. The column serves as a large industry accessed from the siding along the back. The yard is angled to add interest.