Hi Everyone - would like some advice on a new layout. I've been doing shelf stuff and a Z scale 1x3 foot diorama for awhile, but recently got a 10x10 storage room with AC and power that I can build a larger layout in (for cheap!).
I'd like to put in a relatively simple (still very new to larger layouts) track plan that has great operation potential, and I came up with the following sketch (sorry for the poor quality).
The main concept is that the staging yard is in the front, and can stage trains either to the beginning, end, or via the junction of the layout. Junction is on the mid-left, and the "end" would be right before staging, while the "beginning" would be reached via the lift-out bridge. Trackage for towns and industries is something I don't know how to implement very well, but was wondering what the group thought was possible with this arrangement (am I forgetting something, is this hopelessly optimistic, etc.)
For operations, I really don't like roundy roundy layouts, I really want staging, and I want the option to run in a loop for testing/display purposes. Also, I have access to the entire bottom side of the layout (that's where the roll up door is).
[ Guests cannot view attachments ]