Re: How do utility pole yards work?
« Reply #30 on: September 04, 2022, 12:52:34 PM »
0
I had a look at the Micro Trains ‘pole load’ at the LHS yesterday - it looks like a big hunk of resin (which is exactly what it is) with 1/2 round protrusions running down its length to represent the poles. And the poles appear to be too large a diameter. I think you’d be better of with the sanded dowels,  but you’ll need a lot of them to model even a portion of a real pole yard. For the big stockpiles you could probably use a solid core with only the pole end stubs on the ends and a covering of a couple of layers or full length poles. I just went out a measured the pole across the street from me - I estimate 35 feet from grade to top of pole (plus buried portion), 17” diameter at the base and tapering to 12” at the top. Typical urban distribution network.

I pass a pole manufacturer alongside highway 3 south of Cranbrook BC a couple of times a year; it’s a big operation with acres of poles of different lengths in stockpiles, and raw timber (bark on) logs. The logs come in by truck but the finished poles seem are shipped by rail using ‘log cars’. There are some long narrow structures , one of which must be the pressure treating facility. I don’t know if the logs need to be dry before they can be treated, but that would make sense to me. I think they peel the logs and stack them to season, then treat them to a customers specification prior to shipping. Most of the stockpiles appear to be peeled but untreated poles. There is a big rack like structure that appears to some sort of log peeler, with piles peelings and chips. I recall that there is a chip loader for railcars on the site, but I think most chips are shipped by trucks (getting stuck behind a chip truck on the highway is a nightmare). I’m not sure what the peelings are used for; they must be mostly bark - that’s a lot of bark mulch… I wonder if they have way to produce separate streams for wood chips and bark? There are tank cars on site, which I assume is the treating chemicals. So a pole manufacturer COULD have raw logs and treating chemicals in by rail, and poles and chips/bark peelings out.

A  distribution facility could be lot smaller, mostly limited to piles of poles and handling equipment. Poles would come in by rail and go out by truck…

Geoff

nkalanaga

  • Crew
  • *
  • Posts: 9898
  • Respect: +1446
Re: How do utility pole yards work?
« Reply #31 on: September 04, 2022, 01:44:04 PM »
0
George:  Very true, we don't have the tall, straight trees, as they were all logged out before Washington became a state! 

On the other hand, they have to import the steel towers, since we don't make those locally, so a carload of poles wouldn't be any different.  They still use a lot of smaller poles, some quite tall, which I assume are imported, so who knows.  As far as I know there are no creosoting or other treatment plants anywhere close, so where the poles come from I also don't know.
N Kalanaga
Be well

craigolio1

  • Crew
  • *
  • Posts: 2458
  • Respect: +1773
Re: How do utility pole yards work?
« Reply #32 on: September 04, 2022, 08:46:23 PM »
0
I had a look at the Micro Trains ‘pole load’ at the LHS yesterday - it looks like a big hunk of resin (which is exactly what it is) with 1/2 round protrusions running down its length to represent the poles. And the poles appear to be too large a diameter. I think you’d be better of with the sanded dowels,  but you’ll need a lot of them to model even a portion of a real pole yard. For the big stockpiles you could probably use a solid core with only the pole end stubs on the ends and a covering of a couple of layers or full length poles. I just went out a measured the pole across the street from me - I estimate 35 feet from grade to top of pole (plus buried portion), 17” diameter at the base and tapering to 12” at the top. Typical urban distribution network.

I pass a pole manufacturer alongside highway 3 south of Cranbrook BC a couple of times a year; it’s a big operation with acres of poles of different lengths in stockpiles, and raw timber (bark on) logs. The logs come in by truck but the finished poles seem are shipped by rail using ‘log cars’. There are some long narrow structures , one of which must be the pressure treating facility. I don’t know if the logs need to be dry before they can be treated, but that would make sense to me. I think they peel the logs and stack them to season, then treat them to a customers specification prior to shipping. Most of the stockpiles appear to be peeled but untreated poles. There is a big rack like structure that appears to some sort of log peeler, with piles peelings and chips. I recall that there is a chip loader for railcars on the site, but I think most chips are shipped by trucks (getting stuck behind a chip truck on the highway is a nightmare). I’m not sure what the peelings are used for; they must be mostly bark - that’s a lot of bark mulch… I wonder if they have way to produce separate streams for wood chips and bark? There are tank cars on site, which I assume is the treating chemicals. So a pole manufacturer COULD have raw logs and treating chemicals in by rail, and poles and chips/bark peelings out.

A  distribution facility could be lot smaller, mostly limited to piles of poles and handling equipment. Poles would come in by rail and go out by truck…

Geoff

Thanks Geoff. On Vancouver Island there were a few pile yards. That’s what they are listed as in my list of lineside customers. Of course none of them exist anymore. They were exported off the island and in the pics I’ve seen of thr loads, were peeled but untreated.  I’m not sure where that peeling occurred. But it would be cool to include the ability to ship out chips as well. I have a lot of skeleton log cars and chip cars…. And need a purpose for them.

Craig

Angus Shops

  • Crew
  • *
  • Posts: 779
  • Respect: +275
Re: How do utility pole yards work?
« Reply #33 on: September 04, 2022, 10:34:07 PM »
0
Ooh, I forgot, there’s a big pole yard near where I live! Check out street address 25 Braid St., New Westminster….

Geoff

craigolio1

  • Crew
  • *
  • Posts: 2458
  • Respect: +1773
Re: How do utility pole yards work?
« Reply #34 on: September 05, 2022, 08:49:48 PM »
0
Ooh, I forgot, there’s a big pole yard near where I live! Check out street address 25 Braid St., New Westminster….

Geoff

Wow you weren’t kidding! That’s massive!!

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 24747
  • Head Kino
  • Respect: +9272
    • Conrail 1285
Re: How do utility pole yards work?
« Reply #35 on: September 06, 2022, 10:23:41 AM »
0
There's another one.
https://www.google.com/maps/place/Cockeysville,+MD/@39.47548,-76.6455054,256m/data=!3m1!1e3!4m5!3m4!1s0x89c81267a4ed8067:0x9af562c1d29b3603!8m2!3d39.4812172!4d-76.6438598

That was the last place I saw a non-MTA locomotive on this part of the NCR. I saw an NS GP38-2 sitting there one day. Didn't think to take a photo. Then the next year the line was "abandoned". Snost and lost.

cv_acr

  • Crew
  • *
  • Posts: 2676
  • Gender: Male
  • Respect: +132
    • Canadian Freight Railcar Gallery
Re: How do utility pole yards work?
« Reply #36 on: September 06, 2022, 05:15:52 PM »
0
On the receiver end, the utility pole company in Guelph, ON where I used to live receives poles via rail, but their facility is not rail-located.

They transload from rail to truck at a spur in town and ship to their yard. Basically a team track operation. It's nothing more than a track with a gravel driveway along one side.

craigolio1

  • Crew
  • *
  • Posts: 2458
  • Respect: +1773
Re: How do utility pole yards work?
« Reply #37 on: September 07, 2022, 02:30:51 PM »
0
On the receiver end, the utility pole company in Guelph, ON where I used to live receives poles via rail, but their facility is not rail-located.

They transload from rail to truck at a spur in town and ship to their yard. Basically a team track operation. It's nothing more than a track with a gravel driveway along one side.

Hmm that’s an interesting idea. I don’t have a ton of space in the spot that I have for this, so I won’t have a huge amount of poles in stock piles there. More like a few car loads. Maybe a transload would be better. And then I can justify spotting other car types in there.

Craig

Dksw

  • Posts: 23
  • Respect: +10
Re: How do utility pole yards work?
« Reply #38 on: September 12, 2022, 09:30:25 AM »
+1
Here are some shots of the Guelph Utility Pole (Stella Jones) unloading site.  It was essentially a "team track" operation, located on railway property on narrow strip of land between the road and the main line track.
I took photos in summer and winter, a whole variety of car types and size of poles, including a CP Rail idler flat in between a few long loads for good measure.
A few of these cars can be be found RTR from MT and WOT.
[ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ] [ Guests cannot view attachments ]

craigolio1

  • Crew
  • *
  • Posts: 2458
  • Respect: +1773
Re: How do utility pole yards work?
« Reply #39 on: September 17, 2022, 01:12:26 PM »
0
Here are some shots of the Guelph Utility Pole (Stella Jones) unloading site.  It was essentially a "team track" operation, located on railway property on narrow strip of land between the road and the main line track.
I took photos in summer and winter, a whole variety of car types and size of poles, including a CP Rail idler flat in between a few long loads for good measure.
A few of these cars can be be found RTR from MT and WOT.
(Attachment Link) (Attachment Link) (Attachment Link) (Attachment Link) (Attachment Link) (Attachment Link) (Attachment Link) (Attachment Link) (Attachment Link)

This is what I was thinking of.  More of a team track idea.

John

  • Administrator
  • Crew
  • *****
  • Posts: 13398
  • Respect: +3258
Re: How do utility pole yards work?
« Reply #40 on: September 17, 2022, 01:28:49 PM »
0
Dual industry for switching  --- pole loads, and also transformers .. for example the BGE yard that Ed linked to ..

TravelingCarpenter

  • Crew
  • *
  • Posts: 76
  • Respect: +98
Re: How do utility pole yards work?
« Reply #41 on: September 24, 2022, 10:19:54 PM »
0
I have been meaning to reply to this thread, but you know,,life.

I currently have Bell Pole Co., which is New Brighton Mn. It currently is served by the Minnesota Commercial.

Google Earth Link


The industry sits right next to the MC yard. You can see in the G Earth view,, it takes a lot of space up. In my late 1970’s world it is served by the Minnesota Transfer railway and/or Soo Line.  For reference, the North/south tracks are MC ( MTry), east/west is the Soo Line, current day CN. Which was WC