Author Topic: Hand Laying Turnout Video  (Read 1351 times)

0 Members and 1 Guest are viewing this topic.

John

  • Administrator
  • Crew
  • *****
  • Posts: 13446
  • Respect: +3311
Hand Laying Turnout Video
« on: November 24, 2007, 09:40:21 PM »
0
The first of 27 part video on hand laying turnouts. This is by the same guy that did the video series on extruded foam scenery


http://www.youtube.com/watch?v=gp8DhzN6dao


SquirrelHollow

  • Crew
  • *
  • Posts: 540
  • Gender: Male
  • Grease Monkey
  • Respect: 0
Re: Hand Laying Turnout Video
« Reply #1 on: November 24, 2007, 09:57:39 PM »
0
If any of you have ever visited the site, this is "TheBige" Everet, from www.nscale.org.  I haven't visited that site in months. But, odds are, he's still around if you have questions or comments.
-Robert

Uintah Railway, Utah Railway.

SquirrelHollow

  • Crew
  • *
  • Posts: 540
  • Gender: Male
  • Grease Monkey
  • Respect: 0
Re: Hand Laying Turnout Video
« Reply #2 on: November 24, 2007, 10:59:09 PM »
0
Ok, I just tortured myself through Part 9 of the turnout series.

I couldn't watch any more.  It's great that he is sharing, but his progression is killing me.  It's just sooooo slow.

And I genuinely see the usefullness of a Fast Tracks jig.  The Point Forming tool maybe, but the jig, definitely.

I don't think I could handle building a turnout on a printed piece of cardstock.  I've done it for an expiremental rerailer, but it wasn't exactly a precision piece of track.
-Robert

Uintah Railway, Utah Railway.

asciibaron

  • Crew
  • *
  • Posts: 3101
  • Respect: +1
    • Steve's Happy Fun Time IntarWebs
Re: Hand Laying Turnout Video
« Reply #3 on: November 27, 2007, 10:42:56 AM »
0
at least he's not using the CNC'd turnout jig.  it makes little sense in my mind to make custom turnouts in an assembly line manner - building them to the track plan in place seems to make more sense - you can have complex and tight configurations at line side industries or in small yards. 

i have been thinking real hard on how to hand lay N scale - i'm not a huge fan of the contact cement method, but it seems to be a good solution.  i have thought about adding a soldered PCB tie every few inches or so which maintains the gauge and would allow a place to add rail feeders.  i not sure how the contact cement method accounts for expansion of the rail due to temp changes.

-steve
Quote from: Chris333
How long will it be before they show us how to add DCC to a tree?

Mark5

  • Crew
  • *
  • Posts: 11094
  • Always with the negative waves Moriarty ...
  • Respect: +639
Re: Hand Laying Turnout Video
« Reply #4 on: November 27, 2007, 12:02:43 PM »
0
27 parts? I don't think I could dream up 27 parts.