TheRailwire
September 03, 2010, 05:17:42 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
 
   Home   Help Login Register Chat  
Google
Pages: [1] 2 3 4   Go Down
  Print  
Author Topic: Weekend Update 2/7/2010  (Read 2311 times)
0 Members and 1 Guest are viewing this topic.
up1950s
Crew
*
Offline Offline

Gender: Male
Posts: 4410





Ignore
« on: February 07, 2010, 10:01:33 AM »

Whatcha got
« Last Edit: February 07, 2010, 12:43:39 PM by up1950s » Logged

up1950s
Crew
*
Offline Offline

Gender: Male
Posts: 4410





Ignore
« Reply #1 on: February 07, 2010, 10:03:19 AM »


 

 

 

 

 

 
Logged

Philip H
Crew
*
Offline Offline

Gender: Male
Posts: 1091



WWW

Ignore
« Reply #2 on: February 07, 2010, 10:06:26 AM »

That's really HAWT Ritchie!
Logged

Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.
A Long and two shorts!
John
Administrator
Crew
*****
Offline Offline

Gender: Male
Posts: 6825




« Reply #3 on: February 07, 2010, 10:06:45 AM »

About 28 inches  Grin


Logged
diezmon
Crew
*
Offline Offline

Gender: Male
Posts: 658


Do they speak English in "What"?


WWW

Ignore
« Reply #4 on: February 07, 2010, 10:07:09 AM »

finally started scenicing the other end of the shelf layout.





Logged

wm3798
Crew
*
Offline Offline

Gender: Male
Posts: 8325


Modeling on a Shoe String!


WWW

Ignore
« Reply #5 on: February 07, 2010, 10:23:05 AM »

Week three with no camera. Sad

Made a little progress on Elkins, but mostly working on decoders for you mugs.

Lee
Logged

Route of the Alpha Jets

Lee Weldon www.wmrywesternlines.net
Puddington
Crew
*
Offline Offline

Gender: Male
Posts: 900


"On time" ?... We're the CPR - what a question !


WWW

Ignore
« Reply #6 on: February 07, 2010, 10:29:37 AM »

Richie: You're just killin me with that stuff...................

I got back to my own projects after the completion of the Andrew Junction....

I recently found this old Life Like FB2 dummy unit in a box; I had bought it for $ 2.00 at a show many years ago. A coupler change; some home made winterization hatches and some detailing; a renumber and weathering job later and it's ready for service.....





I've also continued to work on my Model Power 4-6-2 Heavy Pacific by modifying the tender to match the CPR version more closely....







Lots more work to do on her.....
Logged

If you dislike Geeps; C Liners and Trainmasters then I can't help you..... It's 1973 in MY world thank you very much.....
David K. Smith
Crew
*
Offline Offline

Posts: 2837





Ignore
« Reply #7 on: February 07, 2010, 10:36:06 AM »

Pretty much finished Landsend Farm.
 

 

 
Logged

UP1996
Crew
*
Offline Offline

Gender: Male
Posts: 36





Ignore
« Reply #8 on: February 07, 2010, 10:54:33 AM »

The auto carriers are awesome !
I went out and purchased a HF Mighty Might table saw the other day and commenced construction on
a small outbuilding/barn for the layout.

The saw works well for smaller pieces of material however, I'm going to have to build a sled and a better miter gauge.
The sliding miter supplied is sloppy and small.
Placed the outbuilding temorarily on the layout at Lookout Junction to see how it looks.


I used scale plywood and some basswood strips. Weathered the exterior walls with Bragdon powders
Planning to lightly weather the roof this afternoon and then Dulcote the whole thing.
I'm also working on weathering my first car, the Rail Box in the photos.


I plan to give it a few more yellowish white acrylic washes this weekend in attempt to add a bit more
paint fading. Also, I don't like how the door turned out.  Tongue

Logged

-Warren
BCR 570
Crew
*
Offline Offline

Gender: Male
Posts: 147



WWW

Ignore
« Reply #9 on: February 07, 2010, 12:24:03 PM »

Work continues on the extension from the upper end of the helix onto the upper deck.  These two photographs show the foam trackbed in place on the sub-roadbed:






The next two photographs show the handlaid Code 40 track sitting in place for a test fit:






The next tasks are to install super-elevation underneath the track, drill holes and attach feeders, and run the bus wires so that this new section of track can be tested with a locomotive.  I have already backed a string of freight cars over the new track, but the gap between power districts prevents a locomotive test until the wiring is in place.

During the week I also experimented with how best to label the wiring which will soon be multiplying underneath the layout:




I also wired up a lamp to provide a load for my Ramp Meter so that it will also measure current as well as voltage:




Tim
Logged

T. Horton
North Vancouver, B.C.
BCR Dawson Creek Subdivision in N Scale
www.bcrdawsonsub.ca
Bangorboy
Crew
*
Offline Offline

Gender: Male
Posts: 46

South Okaloosa N Scalers




Ignore
« Reply #10 on: February 07, 2010, 04:50:59 PM »

About 28 inches  Grin

Doesn't that make it hard to walk?

Bill B
« Last Edit: February 07, 2010, 05:00:06 PM by Bangorboy » Logged

Bill B
South Okaloosa N Scalers
http://sontrak.spaces.live.com/
Bangorboy
Crew
*
Offline Offline

Gender: Male
Posts: 46

South Okaloosa N Scalers




Ignore
« Reply #11 on: February 07, 2010, 04:56:08 PM »


I also wired up a lamp to provide a load for my Ramp Meter so that it will also measure current as well as voltage:




Tim


How does this measure current in anything other than the lamp?  If I can understand this, I might try it with my RRampmeter as well.

I thought the RRampmeter would measure only the current that flows through it.  In other words, if the RRampmeter is connected at one end and measures the track voltage, how does adding a lamp or other load to the other end cause it to measure the current to the track?

Thanks.

Bill B
Logged

Bill B
South Okaloosa N Scalers
http://sontrak.spaces.live.com/
conrail98
Crew
*
Offline Offline

Gender: Male
Posts: 203



WWW

Ignore
« Reply #12 on: February 07, 2010, 05:41:50 PM »

Shoveled the 24" of snow, work on my level 2 portion of my layout plan and started cleaning the basement in preparation for my 4 day weekend coming up,

Phil
Logged

Ed Kapuscinski
Global Moderator
Crew
*
Offline Offline

Posts: 8904



WWW
« Reply #13 on: February 07, 2010, 06:23:47 PM »

I was going to start working on some benchwork for my MG tower module, but instead just slacked off all weekend (after shoveling).
Logged

Dave Vollmer
Crew
*
Offline Offline

Gender: Male
Posts: 1750


Asshat since 2007.


WWW

Ignore
« Reply #14 on: February 07, 2010, 06:52:45 PM »

Did more work on Enola...



That's my 6-car Trailvan train there...



Pardon the mess behind; I haven't yet built a portable backdrop for photos.

Logged


http://www.thevollmerfamily.com/Pennsy/index.html

You love CONRAIL.  You need CONRAIL.  You will join.

http://thecrhs.org/
Pages: [1] 2 3 4   Go Up
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.11 | SMF © 2006-2009, Simple Machines LLC Valid XHTML 1.0! Valid CSS!