0 Members and 1 Guest are viewing this topic.
So I've been thinking about building an NTRAK version of MG Tower for a while (and plan on it when I have a basement to house it).But on the way into the office this morning, I was thinking that if we got a bunch of us together, we could probably do most of the line from ALTO to Johnstown. This type of undertaking is not without precedent. Our own AlkemScaleModels took part in a similar plan years ago to do the C&O New River Gorge area. I think I know enough talented modelers who could come together and make this happen. Many of them hang out here.What do you all think?
Quote from: Ed Kapuscinski on July 10, 2009, 10:24:00 AMSo I've been thinking about building an NTRAK version of MG Tower for a while (and plan on it when I have a basement to house it).But on the way into the office this morning, I was thinking that if we got a bunch of us together, we could probably do most of the line from ALTO to Johnstown. This type of undertaking is not without precedent. Our own AlkemScaleModels took part in a similar plan years ago to do the C&O New River Gorge area. I think I know enough talented modelers who could come together and make this happen. Many of them hang out here.What do you all think?Great idea. We (John Drye, Matt Schaefer, Brian Brendel and others) almost pulled this off at one point. If you want, I can try to see if I still have the track plan for that module set. It's on my home machine someplace. I think Matt actually built the start of the Horseshoe curve modules before the project lost momentum.I have been working with John Drye on developing a PRR 4T signal bridge that will work with the wider track spacing. The signal bridge I currently sell is made to prototype 13 ft track spacing and is too narrow for 4 tracks at 1.25 inch track spacing. I made the first prototype for John and it looks good. I will make them available for sale once I finish the drawings. This version of the kit is laser cut from a new proprietary material. It glues up with regular white glue. In case you don't know, John Drye is working on a home layout that covers Altoona to Cresson in a 15 by 21 ft basement with 18 ft of staging in an adjacent room. I believe he has MG tower modeled track for track. I am nearly out of PRR signals and will put in an order for a second run. Thanks for your support. Would you all be interested in having these as pre-assembled mast signals? I don't think it's practical to do the signal bridge as a pre-assembled kit as there are too many signaling variations. Plus, the new laser cut kit only takes about 30 minutes to assemble any way. It's not hard.
Well, I'd say 3 tracks, since that's the "spec", but I wouldn't scream about 4. I think it'd boil down to who'd be involved.No transitions would be needed even if it were 4 tracks, as long as they're all at the proper (ugly) spacing. But by keeping it all to spec, it'd mean that individual pieces can be used wherever. This way if I build one we can use it with BANTRAK, but if, say, Dave V did one, he could break up the western scenery at his local group and show them some REAL railroading...And you know the beautiful part of NTRAK modules? If you want a grade, just adjust the leveling bolts.
Nice! I'd love to meet John one of these days.And yeah, the signals will be key. But, as you can see, you have plenty of time.Think we could persuade you to join in on our endeavor? I know you don't have a great allegiance to any one road, and I know you'll be done with the USMRR at some point...